CNRL Horizon — Plant 61C Firewater

Project Owner:   Canadian Natural Resources Ltd

Project Location:   CNRL Horizon

Project Date:   September 2013 – November   2014

Project Manager:   D.J. Grant

Project Description: 

The existing firewater system surrounding Plant 61C did not provide sufficient access to emergency water for the designed expansion of Plant 61C. An additional fire hydrant and isolation valve was tied into the exiting system to meet the new requirements. The high ground water table created challenges on this project. An engineered trench box was used for this excavation to ensure the safety of all workers.