Project Owner: Canadian Natural Resources Ltd
Project Location: CNRL Horizon
Project Date: September 2013 – November 2014
Project Manager: D.J. Grant
Project Description:
The existing firewater system surrounding Plant 61C did not provide sufficient access to emergency water for the designed expansion of Plant 61C. An additional fire hydrant and isolation valve was tied into the exiting system to meet the new requirements. The high ground water table created challenges on this project. An engineered trench box was used for this excavation to ensure the safety of all workers.