780 598-1376

info@twocrossings.ca

PROJECT

Devon Energy Pike Lodge – Deep Bury Utilities

Project Owner:   Devon Energy

Project Location:   Devon Pike Site, Conklin, AB

Project Date:   May 2013 – July 2014

Project Manager:   D.J. Grant

Project Description: 

Pike Lodge Project included activities such as excavation, storm sewer, sanitary sewer, potable water and firewater installation, testing systems, backfilling and finish grading. Other activities included the installation of sanitary lift station equipped with pumps and storage chamber.