Project Owner: Suncor Energy Inc.
Project Location: Suncor Base Plant
Project Date: September 2016
Project Manager: D.J. Grant
Project Description:
A 30m section of the gabion basket retention wall in Plant 4 was displaying signs failure. This project included the removal of failed sections and installation of new gabion baskets, re-using the existing rock product. A weeping tile system was installed behind the wall to relieve any hydrostatic pressure and prevent future failure.