Project Owner: Suncor Energy Inc.
Project Location: Suncor East Tank Farm – Fort McMurray, AB
Project Date: May 2012 – July 2013
Project Manager: D.J. Grant
Project Superintendent: Dave Crawford
Project Description:
The scope consisted of civil earthworks, with the largest portion being the re-construction of the retention pond. The existing pond liner was removed, slope regraded and stabilized, weeping tile system along with vaults and pumps installed and the installation of new pond liner.
Site grading, road construction, culvert installation, tank containment berms with polyurea liner, finish grading and pad construction were also part of the scope.