780 598-1376

info@twocrossings.ca

PROJECT

Underground Firewater System Expansion

Project Owner:   Suncor Energy Inc.

Project Location:   Suncor Energy FirebagSite

Project Date:   October, 2007 – March, 2008

Project Manager:   D.J. Grant

Project Description: 

The Suncor Firebagsite required an expansion to the firewater system for a new sulphurrecovery unit. 

Excavation activities were performed to expose the existing firewater system and tie-ins were completed for the installation of new isolation valves and fire hydrant assemblies. 

The work was executed with no disruption to the operating plant and minimal down time on the firewater system.