Suncor Firebag – U&O Stage 3 Firewater

Project Owner:   Suncor Energy Inc.

Project Location:   Suncor FirebagSite

Project Date:   June 2007 – January 2008

Project Manager:   D.J. Grant

Project Description: 

For Suncor’s Stage 3 insituexpansion at the Firebagsite, CarmacksGroup was contracted to perform the installation of firewater system for the new administration complex. Other works included site grading for parking lot construction. 

Underground Firewater System Expansion

Project Owner:   Suncor Energy Inc.

Project Location:   Suncor Energy FirebagSite

Project Date:   October, 2007 – March, 2008

Project Manager:   D.J. Grant

Project Description: 

The Suncor Firebagsite required an expansion to the firewater system for a new sulphurrecovery unit. 

Excavation activities were performed to expose the existing firewater system and tie-ins were completed for the installation of new isolation valves and fire hydrant assemblies. 

The work was executed with no disruption to the operating plant and minimal down time on the firewater system.

Suncor Firebag COGEN – Firewater Expansion

Project Owner:   Suncor Energy Inc.

Project Location:   Suncor FirebagSite

Project Date:   August – October 2007

Project Manager:   D.J. Grant

Project Description: 

Upgrades to the existing firewater system were required to provide fire protection for Suncor’s cogeneration facility and administration complex. The scope of work consisted of excavation, fabrication, installation, testing, and backfill of new firewater system within an existing network of live high voltage electrical utilities. Working closely with TransAlta, the utility crossings were completed safely and the project was completed on schedule.

Devon Energy Pike Lodge – Deep Bury Utilities

Project Owner:   Devon Energy

Project Location:   Devon Pike Site, Conklin, AB

Project Date:   May 2013 – July 2014

Project Manager:   D.J. Grant

Project Description: 

Pike Lodge Project included activities such as excavation, storm sewer, sanitary sewer, potable water and firewater installation, testing systems, backfilling and finish grading. Other activities included the installation of sanitary lift station equipped with pumps and storage chamber. 

Suncor Fort Hills – Firehall Civil & Underground

Project Owner:   Clark Builders

Project Location:   Suncor Fort Hills

Project Date:   August 2015 – October 2016

Project Manager:   D.J. Grant

Project Description:
The EHS Firehall project included the excavation, installation and backfilling of deep underground services that consisted of potable water, firewater, sanitary sewer and gas lines. Other civil works included site grading, site drainage, road and parking lot construction, foundation excavation and backfill.